The UK's biggest Primary Healthcare Centre: |
When construction began, 27,500 cubic metres of soil was excavated - enough to fill 11 Olympic swimming pools. |
The building stands on 450 concrete piles. Their total length equals two laps around Silverstone racing circuit. |
The building‘s floor area would cover 2 Wembley football pitches - 12,500 square metres. |
It will house 400 staff and be visited by 2,700 patients per day from a local catchment of 45,000 and will provide specialist services for 250,000 residents from a wider catchment area. |
Aldershot Centre of Health Contains: |
770 rooms linked by 900m of corridors… |
250 miles of electric cabling which would reach from Aldershot Barracks to Catterick Barracks
and 15 miles of piping… |
900 doors, 26,000 ceiling tiles, 6,500 electrical sockets and 600 taps. |
It will house 400 staff and be visited by 2,700 patients per day from a local catchment of 45,000 and will provide specialist services for 250,000 residents from a wider catchment area. |
Back to Aldershot Centre of Health Project »